Construction hipermarket Praktiker /Burgas/
Assignor | KIZ Projects Gmbh - Germany KHI Bulgaria EOOD |
Period | 06.2007 - 12.2007 |
Activaties | Preparation and legalization of documentation. Partial construction management in cooperation with KIZ Projects Gmbh. Logistics. |
Volume of managed works | 9 000 000 BGN |
Exceptional results have been reached during the demolition and recycling of the debris of the old brewery „Burgasko pivo”. The whole amount of demolished concrete material was recycled by grinding into small gravel-large pieces and used 100% for the new vertical planning. |
|